BEFORE INSTALLING THE SPIKES, THE SUBSTRATE SHOULD BE CLEANED THE SURFACE MUST BE CLEAN, DRY AND FREE OF GREASE OR DIRT
THE BASES CAN BE SHORTENED (AS DESIRED) TO MATCH THE LENGTH OF THE ADHESIVE SURFACE
SPREAD THE GLUE ALONG THE BASE AT A WIDTH OF AT LEAST 5MM PRESS AGAINST THE SURFACE TO BE INSTALLED NAILS, SCREWS OR MOUNTING TIES CAN BE USED (OPTIONAL)
WHEN USING THE GLUE, OBSERVE THE STANDARD RULES OF OHS: - AVOID CONTACT WITH SKIN - IN CASE OF SKIN CONTACT, RINSE IMMEDIATELY WITH WATER - KEEP OUT OF THE REACH OF CHILDREN
SENATOR ŁÓDŹ 90-763 ŁÓDŹ, POLAND, UL. LEGIONÓW 96 phone +48 42 6330709, +48605202929 www.kolceochronne.pl info@kolceochronne.pl